Skip to main content

We are experiencing higher volumes of enquiries at the moment related to successive significant rainfall events in January and February. We are working hard to reply to these enquiries while at the same time planning and undertaking work to remove debris dams and blockages, and remediate impacted areas.

Close alert

Tongariro River flood protection scheme - Service level review

TR 2017/41

Report: TR 2017/41

Author: Duncan Grant

About this report

The Waikato Regional Council (WRC) manages the flood protection and river management assets (e.g. stopbanks, floodwalls, floodgates, rock revetments and associated river structures and works) along the Tongariro River. Together, these assets and works are designed to provide protection against floods up to a 1%AEP event. To ensure service level delivery the assets and works are monitored and surveyed and their performance assessed regularly.

Read or download the report

Tongariro River flood protection scheme - Service level review
[PDF, 3.3 MB]