Pohue flood protection scheme design report
TR 2013/47
Report: TR 2013/47
Author: Megan Wood (Wainui Consulting Limited)
About this report
The purpose of this Design Report is to provide a summary of the works that have been undertaken at Pohue to reduce the flood hazard from Pohue Stream, including the rationale behind the scheme development, the agreed levels of service, the design details, as built information, the operation and maintenance requirements of the scheme, the residual flood risk and the scheme review requirements.
The Design Report includes the following sections:
- Catchment overview
- Scheme design
- Flood mitigation scheme
- Agreed levels of service
- Operation and maintenance
- Residual flood risk
- Planning controls, and
- Scheme review.
To ask for help or report a problem, contact us
Tell us how we can improve the information on this page. (optional)