Waihou Valley Scheme – Service Level Review
TR 2012/12
Report: TR2012/12
Author: Murray Mulholland
About the document
This report presents a review of service levels for the Waihou Valley Scheme main floodway stopbanks, stoplogs and spillways. As assessed in this review, the current performance of the Waihou Valley Scheme main floodway stopbanks is marginal in terms of the Zone Management Plan performance target (i.e. no more than 2% of stopbanks are below design flood level). Approximately 2% by length (2.5 km) is within performance category 5 indicating that remedial work is required within the next 3 years.
To ask for help or report a problem, contact us
Tell us how we can improve the information on this page. (optional)