Skip to main content

The doors to our Whitianga and Paeroa offices will be closed for the summer break from 4pm on Friday, 20 December, while our Taupō and Hamilton offices will close for the summer break at 1pm on Tuesday, 24 December. All offices will reopen on Monday, 6 January 2025. To report air or water pollution, unsafe water activities in or on a river, lake or harbour, or make a general enquiry or information request during this time, call us 24/7 on 0800 800 401.

Close alert

Erosion and sediment control plan preparation guideline

About the document

An erosion and sediment control plan (E&SCP) identifies the measures that will be implemented to minimise erosion and subsequent sediment loss from a site as a result of soil disturbing activities. It has two parts, a written methodology and a site plan.

Read the document

Erosion and sediment control plan preparation guideline [PDF, 1005 KB]