Skip to main content

Our Whitianga office will be closed to the public on Wednesday, 22 January. To report air or water pollution, unsafe water activities in or on a river, lake or harbour, or make a general enquiry or information request during this time, we can be contacted 24/7 on 0800 800 401.

Close alert

Erosion and sediment control plan preparation guideline

About the document

An erosion and sediment control plan (E&SCP) identifies the measures that will be implemented to minimise erosion and subsequent sediment loss from a site as a result of soil disturbing activities. It has two parts, a written methodology and a site plan.

Read the document

Erosion and sediment control plan preparation guideline [PDF, 1005 KB]